Hasil Pencarian: 4 lowongan

 ...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations. About... 

Potentia HR Consulting

Jakarta Selatan
7 hari yang lalu
 ...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations. About... 

Potentia HR Consulting

Jakarta Selatan
7 hari yang lalu
 ...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations. About... 

Potentia HR Consulting

Jakarta Selatan
7 hari yang lalu
 ...peering, gateways, SD-WAN secure fabric). A certificate in any networking area is a plus. Have a good knowledge of encryption and tunneling protocols (PKI, IPSec, SSL VPN, TLS, IKE, IKEv2, etc.) Understand application protocols in the context of OSI network layers and... 

Dealls

Jakarta
8 hari yang lalu