Hasil Pencarian: 4 lowongan
...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations.
About...
...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations.
About...
...sets (Phase-1), and Track Work, including associated systems/subsystems for 3.800m (approx.) of twin tube tunnels, approx. 2.050m (approx.) of cut and cover tunnel structure, 7 underground stations together with 1 receiving sub-station and 2 traction sub-stations.
About...
...peering, gateways, SD-WAN secure fabric). A certificate in any networking area is a plus.
Have a good knowledge of encryption and tunneling protocols (PKI, IPSec, SSL VPN, TLS, IKE, IKEv2, etc.)
Understand application protocols in the context of OSI network layers and...