Hasil Pencarian: 2 lowongan

 ...the design of the program is in line with local government planning and strategic targets. We have reviewed existing policies and strategy at regency level to understand the current regulatory gaps that must be addressed to ensure optimum empowerment, both towards the... 

SYSTEMIQ

Banyuwangi Kab., Jawa Timur
1 sebulan lalu
 ...the design of the program is in line with local government planning and strategic targets. We have reviewed existing policies and strategy at regency level to understand the current regulatory gaps that must be addressed to ensure optimum empowerment, both towards the... 

SYSTEMIQ

Banyuwangi Kab., Jawa Timur
1 sebulan lalu